PRISM Operation Real Time Report

学生によって作られた“超小型”人工衛星。果たして、宇宙で動くのか?!
スポンサーサイト
上記の広告は1ヶ月以上更新のないブログに表示されています。
新しい記事を書く事で広告が消せます。
--/--/-- -- | Category:スポンサー広告 |permalink
High Speed Downlink (FM packet)
02:05 (JST) Today's all operation task review: Current satellite status is almost normal.
01:35 (JST) Data analysis is started.
CW decode

01:16 (JST) GS receiver channel is open for the satellite beacon.
GSN

01:00 (JST) OBJECT B is seleted for the track target.
00:30 (JST) ISSL GS starts preparing for the operation. Next operation is for CW.

00:15 (JST) Operation task review.
23:56 (JST) FM packet reply is confirmed. Data analysis is started.
orbit analysis

23:38 (JST) Arrival of Mr. Nojiri.
23:35 (JST) GS receiver channel is open for the satellite beacon.
23:25 (JST) This time also OBJECT B is targeted for track
23:05 (JST) ISSL GS prepares for the operation.
スポンサーサイト
2009/01/23 Fri | Category:Launch, First Voice | track back(0) |permalink
この記事のトラックバックURL
トラックバック(track back)
    home    
上記広告は1ヶ月以上更新のないブログに表示されています。新しい記事を書くことで広告を消せます。